Go to Main Contents

School network certification and billing

We'll sort out the operator's path and the target, and we'll figure out how to connect the campus network.

Suitable for universities, middle and senior information centres, campus network operators, and operators and integrated players involved in networking.

There is no commitment to arbitrary zero conversion of the current network, unconditional direct connectivity for all operators and no performance figures for the de-release model or certification conditions.

• Two sets of route judgements

Sub-operator structure, sub-project objectives

The two diversion decisions were either normal NATSHEL_AUTH_BILLING or require a proxy operation by the operator in conjunction with AA/BRAS.

Group I: Single/multi-operator

Single operatorMulti-operator

Single operator

Emphasis is placed on identifying existing exports, account systems and certification control points, judging whether to access existing links or replace the old platform.

Confirmed

  • Operator lines and account numbers
  • Authentication Control Point Position
  • Existing billing or AAA system

Group II: Authentication & Billing / Sub-routing

Normal Authentication & BillingPPPoE dialling/ operation project

Normal Authentication & Billing

The establishment of a unified management around identity, accounts, packages, sessions and releases is not equivalent to the assumption of operator-based allocations.

Confirmed

  • Certification
  • Fees and packages
  • Whether to migrate old user data

• Rapid fit-out

First communication, confirm five things.

The answer could also be submitted without knowledge; unknown conditions would enter the next list of information.

1

Is the project new, replace old systems or current network expansion?

2

Where are the current network exports, AAA/BRAS, AC or authentication control points?

3

Single operator, multiple operators or need to dial/ AAA forward?

4

Is the project certified only or does it involve fees, packages and self-service?

5

Is there a need to match the HIN, payment, log or identify specific abnormal traffic?

:: Four common routes

Platform, NATHHELL_AUTH_GATEWAY and focus capabilities by project portfolio

The normal Authentication & Billing, multi-operator dialling, Anti-Sharing and the new network are different project routes.

Group 01

Normal Authentication & Billing

Manage users, accounts, packages, billings and privileges in a single V7 system, giving priority to the reuse of existing AC, BRAS or gateways that can be certified and released.

V7+ Existing Gateway or AC cooperation; add NATSHEL_AUTH_GATEWAY if necessary

Establishment conditions: recognition of Portal, RADIUS, CoA, PPOE links and existing control point capabilities.

Group 02

Multi-operator dial

Add multi-operator dialling, AAA forwarding or export controls to NATHHELL_AUTH_BILLING and check operator lines, account numbers and terms of linkage on a home-to-house basis.

V7 + NATHHELL_AUTH_GATEWAY+ Multi-Operator Dialing Capacity + Operator Account, Export and Dialing Conditions

Conditions of incorporation: Technical links must be identified separately from operational responsibilities such as fees, settlements and hospitality.

Group 03

NATHHEL_ANTI_SHARING & Terminal Control

For account sharing, private routers or personal broker issues, user traffic is confirmed and a combination of detection, statistics, warning and disposal strategies are then combined.

V7+ Gateway Control + Anti-Sharing or associated detection capabilities

Establishment conditions: effects depend on deployment location, network ping, testing rules and field tests; no commitment to complete elimination.

Group 04

New or modified campus network

The combination of classroom, dormitory, office area and outdoor area equipment is only possible when the project also contains wireless coverage, access to electricity or full-light network construction.

V7 + Authentication Gateway; add AC, AP, PoE or full-light switch as required

Establishment conditions: Models and quantities are to be determined by linking points, wiring, power supply, uplink and capacity validation.

Project implementation records

Project for students of the Tsangxi Institute of Tourism Cooking and Development (SEP)

The project has been using Authentication & Billing and the Accreditation Depot Gateway since autumn 2024 to provide a proxy Internet service for students and support campus networks working in tandem with multi-operator access.

:: Multi-operator access

Backstage maintenance ongoing

Relevant programme information

The project is organized according to the conditions applicable, the programme boundaries and practices that will help you to further determine the course of the project.

04 Next steps

Submit first school type, size and current status

The model of the equipment can be supplemented; a preliminary determination will indicate which operators, pings, interfaces or migration information are required.

Get a preliminary fit for campus network

:: Conditions of deployment

Further understanding of the implementation requirements of the campus network

The project is a web-based initiative to explore the possibilities of networking, third-party interfaces, network adaptation conditions and common problems in campus projects.

View the signs of access control relationships at campus+
View third-party dependence and alignment conditions+
  • Operator AAA/BRAS, Lines and Account Resources
  • Unified school identity, a cartoon and financial system
  • Payment and text service
  • AC, BRAS, gateway or core network equipment available

Project boundary

A single identity, a cartoon, payment, text message, AAA/BRAS all require confirmation of interfaces, fields and connecting resources.

View possible triggering network modifications+
  • Existing control points do not have the required Portal, RADIUS, CoA or tactical release capability
  • The old system migration requires parallel operation or replacement equipment
  • Multi-operator dialling requires adjustments to exports, address pools and routes
  • Lack of necessary network zoning in accommodation and teaching areas

Campus project FAQ

Can the current network equipment be certified directly without replacement?

It is possible, but only after confirmation of the export, certification control points and whether existing ACs, gateways or BRAS have the required external authentication and release capabilities.

Determining the boundary:In the event of a lack of control points or inadequate equipment capacity, adjustments may be required to boost or add equipment.

Is the equipment supporting RADIUS certain to be connected?

You cannot judge by " supporting RADIUS " alone. You also check Portal jumps, attribute mapping, session control, release and bonding conditions.

Determining the boundary:Different brands and versions have different full external authentication capabilities.

Do you want to use the PPPOE proxy for multi-operator access?

Not necessarily. The normal NATHHELL_AUTH_BILLING and the sub-operation are two different routes, judged by operator AAA/BRAS, lines, account number resources and operating duties.

Determining the boundary:Multi-operator access is not a promise of operating gains.

Can fixed co-match and vomiting indicators be provided?

Project-level judgements are to be given after combining hardware, ping, authentication peaks, session models and verification methods.

Determining the boundary:No fixed performance figures for the separation type, links, functional combinations and test conditions are displayed.

Will the information be submitted and the final solution obtained directly?

No. The first information is used to form a preliminary matching judgement identifying which control, equipment, interfaces and implementation conditions need to be supplemented.

Determining the boundary:The final option still needs to be identified with the relevant third party before sale.

The original campus network topic continues

Information on campus operations and implementation topics

The old theme portal has been merged into the campus net site page; the breakdowns and historical details under the original topic are maintained in URL, which is accessible by subject.

Access Program I'll be right back. Telephone counselling