Go to Main Contents

:: Industry developments

Before introducing the University Wi Authentication & Billing gateway, determine whether the current network control point is in place.

Before introducing the Authentication & Billing gateway, we have to determine whether there are suitable control points in the network for authentication jump and release. Many programs move the cards not in the product function but in the existing network...

Your position:Home > Content Centre > Industry News > > Text

Before introducing the Authentication & Billing gateway, it is important to determine whether there are suitable control points in the network that can be certified and released. The card points advanced by many programmes do not match the product function itself, but the location, equipment capability and attribution of the existing network do not match the new scheme. Prepositions are developed from the point of control attribution and feasibility test, without listing the compatibility of equipment or replacing the findings of the site survey.

What's a authentication control point?

The authentication control point is the location in the existing network where uncertified sessions can be identified, page redirected and release or restriction implemented after authentication. The control point may be on a wireless controller, possibly on BRAS or export equipment, or on a gateway device. Determining where the current network control point is, which device is executed, is the question to answer before the portal is introduced; the control point is not clearly attributed, and subsequent jumps and releases lack landing positions.

Determining whether control points are available

Confirming whether the control point can take over a new programme depends on whether the device supports external Portal pages, matches protocols, if the current network control points are already occupied by other systems, and is able to match the authorization properties. These conditions come from equipment models, current network configurations and docking. If existing controls are monopolized by the old system or do not support the required protocol, access will be adjusted at the programmatic level rather than assuming that they can be taken directly.

The current network is pre-selected.

Before judging control points, you have to clear the inside network, wireless, export and existing control points. Where the terminal is connected, which equipment passes through traffic, on which side it is exported, and where the gateway is connected.

Four levels of feasibility.

A programme that is suitable for campuses can be seen in four layers: theoretically there are corresponding Authentication & Billing needs; structural grid-tapping and equipment roles are appropriate; project dimensions have access conditions, including interfaces, alignment and transition arrangements; and commercial dimensions meet school input and support expectations. If one of the four tiers is not viable, then it needs to be clarified rather than based on a direct presumption of first level.

The theoretical feasibility is not the same as architecture, nor are structures ready to be located on site. Control points, protocols and docking conditions need to be verified on-site before entering a decision on landing.

Treatment of control points when occupied

If the existing control points are already occupied by old certification systems or other operations, an assessment is needed of whether they can be carried over in parallel or whether additional equipment will need to be used at connecting locations rather than forcibly taking possession of existing controls. The occupancy and parallel feasibility will come from a check with the current network configuration; if the existing equipment cannot serve both systems, the programme will have to adjust accordingly to location and division of labour, and it cannot be assumed that the original operation could directly release the control point.

Open access to interfaces

In addition to the network control points, whether interfaces for a single identity, a cartoon, text message, and operator are open to peer systems is another type of pre-condition. The interface opening, field mapr scope and range of rights need to be separately identified and cannot be confused with the network control point. When an end interface is not available, the corresponding docking function is listed as pending confirmation, leaving the following docking position in the program but not written as already connected.

What do you do with the network when it's not working?

When the information is insufficient, the uncertainty item is marked as to be surveyed and does not require empirical completion of equipment models, protocol support or compatibility conclusions. The field identifications are required for the status of AC and BRAS, export locations, existing certification systems, control point occupancy and open interfaces.

Form of output for feasibility judgement

The findings are updated with the results of the survey, and do not make confirmations as a condition for establishing the condition.

Several common errors

One miscalculation is that adding a device to the equipment will take over all certifications, ignoring existing control points and equipment protocol constraints; another is whether product-based authentication will be done without matching network devices; and another is that it will be possible to connect structures to the point where the site must be located. These errors are exposed to back-to-work during the docking phase.

Organization and conditions of cooperation are also prefixed

In addition to the technical control points, the co-operation duties of the campus information department, operator and implementer in connection with the interface are also confirmed. Technical conditions are available but organizational cooperation is not in place, and access is impeded.

Summing up

The control point is based on the premise that the gateway is located and connected to it; information is not always available, depending on the results of the site verification.

Access Program I'll be right back. Telephone counselling