How to deploy the factory accommodation Wi Authentication & Billing system in order not to delay plant production

The biggest difference is that the factory can't stop. The production line is turning.

Your position:Home > Content Centre > Industry News > > Text

How to deploy the factory accommodation Wi Authentication & Billing system in order not to delay plant production

The construction of the factory’s accommodations is not the same as the writing network. The biggest difference is that the factories cannot stop. Production lines are turning, there are equipment in the workshops, workers are on shift and the building of the dormitories is too static or the network has been turned around to make a mistake.

This is easy to say, and it's going to be done in detail. The dormitory works, the workers live as usual; network switching, the workers cannot break off online; system access, Authentication & Billing can't make a mistake. Each step has to be planned so that the system can be built without touching the red line produced by the factory.

Survey first, then start.

The first step in deployment is not to buy equipment, but to survey. The building structure of the accommodation building, the layout of the room, the material of the wall directly affects the coverage programme; the location of the weak electrical booths, the original circuit, deciding how the equipment will be placed and how the wire will go; the occupancy of the accommodation building, deciding how to arrange the construction period.

Surveys also ask the bottom line of the factory: which areas are absolutely unworkable, which are not subject to any movement, and where there is no demand for a fire or electricity. The plant’s accommodation is often located in a park area close to the workshop, some of which are built differently from the pure house.

Construction of accommodation area to avoid staff work

The building is occupied by people and the construction time is to be taken care of. Workers in day shifts are less likely to be wiring panels during the day; night work, sleep during the day, and redecorating noise is avoided.

The building is already connected. If the old building is remodeled, should the original network be kept online? Employees work daytime, go back to their dormitory at night and have access to the Internet. Construction can take place during daytime and not overnight, or complaints are made about normal life being affected during construction.

Installation of equipment, without touching the red line of the plant

The accommodation area is a public area of AP, switchboard, Authentication Gateway, installed in the dormitory building and in the weak electrical booths. But it's not always possible to get through some public areas by laying wires, collecting electricity, taking bridges. Which pipes can touch, which cannot be touched, confirming with the engineering department before starting work, obtaining clear scope for construction, then entering again.

Authentication & Billing – the core equipment for the system is also pre-determined. In cloud-end deployment, only network equipment and access layers are needed, with the core on the cloud and little work done in the field; if local deployment is made, server room or weak electrical rooms, enough power supply and heat radiation conditions are confirmed on site.

Switch window, select the production gap

The old system cuts new systems, or the old network is integrated into the new network. The network service breaks down for a short time, and this break window is selected between production. The factory’s production rhythm is regular: succession shifts, rest periods, night shift low load hours are relatively secure windows.

The switch is preceded by a drill. Run the NATSHEL_AUTH_BILLING process in its test environment, and then cut it in some of the dormitories, and verify that all are fine. The switch is written: what is first, what is later, how can problems be reversed? The retreat is more important than the switch, everything is lost, quickly restored to its original state, without affecting the night's online presence.

NATHHELL_AUTH_BILLING system online, without affecting the network workforce

The most important thing is that the employee in use suddenly breaks off the network. The staff are video-taping with their families, and the system has been certified off-line and it has a terrible experience. So before going online, check the stock: how the existing employees' accounts are imported, how the existing online sessions are processed, whether or not they need to re-check them after authentication is changed, all these have predefined.

The common practice is smooth transition: the new system first runs with the old system for a period of time, accounts first guide and authentication strategy first match and switch as unconsciously as possible. Staff are not able to feel that they have changed the system, which is the sign of success on the line. Focusing on certification success rates and complaints within days of being online, and making changes in time instead of finishing up.

Deploy files and responsible persons, stay clear.

After deployment is completed, a system that can be continuously operated is delivered, not a one-time project. Network punctures, equipment lists, account numbers, and transport contacts are to be sorted out and handed over to the factory. Who is responsible for day-to-day maintenance, who handles malfunctions, who finds faults in the system, whose boundaries are clear, and whose carriers are not skin-dry.

The factory dormitory Wi Authentication & Billing system is deployed, not technology but rhythm. When surveying, when construction, when switching and when going online, each step of the plant’s production pace is followed, the deployment process goes well. Put the requirement of continuity in production first in the deployment program, and this project has been right from the start.

The acceptance depends on the fact that each room in the dormitory has enough coverage, whether the peak hours are sufficient, whether the NATSHEL_AUTH_BILLING process is not moving and whether the employee’s account number can be properly opened. The acceptance criteria and receipt point are agreed to with the plant before work starts, and the check-up is done on a case-by-case basis, and it is found that the problem is resolved during the inspection period rather than until the employee is exposed after he or she has been admitted.