The WiFi real name certification system at the new hotel is relatively simple.——The network can be designed zero, all equipment is purchased according to the scheme, and a line is in place. But old hotels are not so lucky. I say the old one for three or five years, but the same type of hotel for ten or more years. The IT infrastructure of these hotels is often the result of multiple folding: the initial integrated cabling could be a super-five line in 2005, with a second round of surveillance, another round of IPTV, another round of WiFi coverage, and the device tags in the engine room will bring up five or six factories, and the cable labels either drop or actually fail to match them. The installation of a hotel WiFi physical name certification system on such an infrastructure requires not technical programmes but archaeology.
Physical route assessment is the first and hardest step.
The hotel WiFi real name certification system Authentication Gateway needs to be placed on the core network node, usually next to the engine room’s core switch. What if the machine room’s physical condition does not support a new device? The most common problem is that there is no room in the cabinet, no power outlets are available, no heat evaporation conditions are not met. There are also problems with lines: the complex of old hotels may use five or more types of wire, but if cable has been used for ten or two decades, oxidation and ageing will result in a significant reduction in actual speed. We met in Shanghai at a well-established hotel that was operating in the 1990s: a big bundle of wires behind the cabinet, with at least one third of the labels blurred or dropped, and new equipment had to be lined up. The wire thing seemed physical, but everything was on the old wire.——The past, with the racks, may have found that a connection was out of order or that it was bitten by rats and then taped to it. These hidden physical problems are not solved. The WiFi real-name system at the hotel goes up and is a time bomb that keeps breaking the web.
The historical burden of network architecture
The old hotel's network is often flat-sized, second floor structure, with all guest rooms, offices, conference rooms in the same broadcast space. This is a perfect set of structures for a few dozen terminals and a time to run a file sharing, but it's today.——Hundreds of smart terminals are online simultaneously, VLAN quarantined and Portal certified.——The problem is that hotels cannot be unconnected with IT, so the renovations must be done in separate batches. Usually one floor first, where the test scheme is feasible, deployment experience is available and one layer at a time. This process combines old networks, routers and strategies to be temporarily configured, with exponentially elevated complexity.
P Pointing and Signal Planning
When the old hotel was on WiFi, APs were usually installed later, not part of the original design. This led to a lot of misalignment: one randomly hung on the corridor ceiling, one by a weak well, or even some hidden in the top, was blocked by a cast plate. The AAP running on these positions may be made up of regular Internet access, but it is not necessary to carry certification for Portal. Reprograming the AP position is a big engineering project.——The practice is often compromise: to prioritize the adaptation of critical areas, such as the lobby, conference rooms, administrative floors, which are sensitive areas; and to test the existing AP positions for signalling first, which does not meet the certification requirements for re-location. The principle is to exchange minimal construction for maximum coverage improvements without affecting hotel operations.
Compatibility checklist for older equipment
The most difficult thing to do with the WiFi Real name certification system is those."Half-old and new."The core switcher is a mainstream model five years ago, probably supporting VLAN and ACL. But the switchboard for access levels may be an even earlier model eight years ago, with restrictions on the number of ACL entries, VLAN numbers, or even SNMP versions. These limitations are usually non-observed, but one could find that equipment is not supportive or has fallen suddenly when it comes to the configuration of dozens of ACL rules. Another neglected is the export router.——The old hotel may still be exporting CPE equipment from the operator, which is often extremely functional and untraceable to complex strategic routings and high-end NAT sessions. So before remodeling, a complete list of equipment will be drawn up, check model numbers and solids will be checked, equipment that does not meet requirements will be marked out, replacement or downgraded in advance.
Construction window and business coordination
The construction time window for the WiFi Real name system upgrade is much narrower than for new projects. New hotels can be built simultaneously during renovation, and old hotels must be in business. That means most operations can only take place at 2 or 3 a.m. and make sure that the network is restored by dawn.——Because we can only break the net for two hours a day. It's not the most troublesome, it's the worst if there is an accident in the construction process.——Like switching the switch to a fibre optic module, or jumping off with a wire-coating grid, which breaks the network on other floors.——It must then be judged in a very short time whether the refund is continuing or not, and wrongly, an operational accident.
The WiFi Real name certification system at the old hotel is modified, and technology is a blueprint. Each screw and every jumper on the site is the real determinant.